Full re-roof located in Feniscowles, Blackburn. Removed the old tiles, battens and felt, installed new breathable membrane with JB Red 2×1 battens. Finished with Marley Ludlow Major tiles in smooth grey, complete with dry verge and dry ridge system.

 

Gallery 17

EPDM flat roof carried out in Cherry Tree, Blackburn. 10ft x 12ft. New boards installed. Job was completed in a single day.

 

Gallery 18

Re-roof located in Walton-le-dale, Preston. The old tiles, battens and felt removed. We installed a new breathable membrane and tanalised 2 x 1 JB Red battens, finished with new Marley double roman tiles in smooth grey, complete with dry verge and dry ridge system. The job was completed in two days from start to finish.

 

Gallery 19

Double bungalow re-roof located in Cherry Tree, Blackburn. Tiles, felt and battens removed and replaced with a new breathable membrane, tanalised battens and Marley Ludlow Major tiles in smooth grey, also complete with the dry verge and dry ridge system. The job was completed in 3 days.

 

Gallery 20

Slate re-roof located in Darwen, Lancashire. Slates and battens removed, installed new breathable membrane and tanalised 25 x 38 battens. Slated back with existing 24 x 12″ slates, also fitted new lead soakers and flashings surrounding the stone chimney.

 

Gallery 21

Slate re-roof located in Blackburn, Lancashire. Slates battens and felt removed. Installed a new breathable membrane and new tanalised 25×38 slate battens. Slated back with existing 18×10″ slates.

 

Gallery 22

Full tile re-roof located in Walton-le-dale, Preston. Tiles, felt and battens removed and replaced with a new breathable membrane, 2X1 JB Red battens and new Marley Ludlow Major tiles in smooth grey. Finished off with the dry verge and dry ridge system. The work was completed in 3 days.